LET

  • Chlor-Alkali Electrolysis
  • WT and WWT engineering

In the city of Abaza (Khakassia), the Aquachlor-500 installation was installed.

In August 2017, the installation of the Aquahlor-500 installation was carried out by LET LLC at sewage treatment plants operated by ABAZA-Energo LLC. The plant has been successfully put into operation and provides disinfection of 8000 m3 of wastewater per day.

Back to "News"